EstiMatrix Phase 1: every PWD SoR edition with generated rate analyses

The foundation release: all PWD Schedule of Rates editions in four zones, a six-sheet linked workbook, rate analyses for every SoR item and a market price hub.

Prime Base Engineering · 10 October 2026 · 2 min read

EstiMatrix Phase 1: every PWD SoR edition with generated rate analyses

Highlights

  • All PWD SoR editions — Civil, E/M, Retrofitting and Lift, zones A–D, searchable by words or item number.
  • Six-sheet linked workbook — overview, BOQ, measurement & BBS, rate analysis, material requisition and floor / phase budget.
  • Every SoR item arrives with its rate analysis, priced at PWD basic rates with today's market prices alongside.
  • Custom items, an item library and a rate analysis vault shared by username or email.
  • Official estimate or tender quote with profit, overhead, VAT and AIT.
  • Market price check when a project opens — update all, some or none, with the budget impact first.
  • Revision history with named revisions and automatic snapshots.
  • Excel with live formulas and print-ready PDF exports.
  • A control panel with two-factor authentication, live visitors, traffic analytics, users, IP rules and a safe CMS.

#release

Related articles