EstiMatrix Phase 1: every PWD SoR edition with generated rate analyses
The foundation release: all PWD Schedule of Rates editions in four zones, a six-sheet linked workbook, rate analyses for every SoR item and a market price hub.
Prime Base Engineering · 10 October 2026 · 2 min read
Highlights
- All PWD SoR editions — Civil, E/M, Retrofitting and Lift, zones A–D, searchable by words or item number.
- Six-sheet linked workbook — overview, BOQ, measurement & BBS, rate analysis, material requisition and floor / phase budget.
- Every SoR item arrives with its rate analysis, priced at PWD basic rates with today's market prices alongside.
- Custom items, an item library and a rate analysis vault shared by username or email.
- Official estimate or tender quote with profit, overhead, VAT and AIT.
- Market price check when a project opens — update all, some or none, with the budget impact first.
- Revision history with named revisions and automatic snapshots.
- Excel with live formulas and print-ready PDF exports.
- A control panel with two-factor authentication, live visitors, traffic analytics, users, IP rules and a safe CMS.
#release
Related articles
Changelog & release notes
EstiMatrix 2026.10: estimatrixbd.com, rebar & steel take-offs, e-GP export and more
Our biggest release: a new home at estimatrixbd.com, a redesigned workspace, smarter measurement sheets, new exports, client links, themes and a knowledge base.
31 Oct 2026 · 2 min read
Changelog & release notes
Feedback tracker, smart BBS, offline autosave and site-engineering tools
October 2026: a feedback and bug tracker, duplicate prevention, dry-to-wet factors, smart bar bending rules with 12 m cutting optimisation, and more.
28 Oct 2026 · 2 min read