EstiMatrix guides

Step-by-step operating guides and walkthroughs for every EstiMatrix tool.

EstiMatrix guides

How to create a BOQ online with EstiMatrix — step by step

From a blank project to a priced, tender-ready bill of quantities on the PWD Schedule of Rates: set-up, measurement, rates, analysis and export.

30 Oct 2026 · 3 min read

EstiMatrix guides

Measurement sheets: Enter-key entry, formulas, deductions and extra columns

Fast keyboard take-off in EstiMatrix — sequential Enter navigation, inline formulas, unit-aware columns, deductions and user-inserted multiplier columns.

29 Oct 2026 · 2 min read

EstiMatrix guides

Rebar take-off in EstiMatrix: bar sizes, unit weights and lapping allowance

Reinforcement items switch to a dedicated take-off: bars × diameter × length → kg, with the unit weight shown, a lapping / wastage percentage and a summary by diameter for ordering steel.

28 Oct 2026 · 2 min read

EstiMatrix guides

Rate analysis on the PWD Schedule of Rates: how EstiMatrix builds it

Every SoR item arrives with a generated rate analysis: material norms from the specification, PWD basic rates for your zone, market prices alongside and a balancing line that keeps the published rate.

26 Oct 2026 · 2 min read

EstiMatrix guides

VAT, AIT, profit and overhead: official estimate vs contractor tender quote

How EstiMatrix handles mark-ups: PWD SoR rates that already include them, a tender quote that strips and re-applies your own, and recalculation at any time with a restore point.

25 Oct 2026 · 2 min read

EstiMatrix guides

Exporting your BOQ: Excel, A4 PDF, e-GP schedule, branding and letterhead

Workbook, client BOQ, blank quotation and e-GP presets; A4 PDF with cover, title block and QR verification; your letterhead and signatures; watermark on or off.

24 Oct 2026 · 2 min read

EstiMatrix guides

Share a BOQ with your client: password-protected read-only links

Instead of emailing a PDF every revision, send a live link that always shows the latest BOQ — without your rate analyses or profit build-up.

22 Oct 2026 · 2 min read

EstiMatrix guides

Switching between metres and feet mid-project — without losing accuracy

Convert a whole project between metric and imperial at any time: dimensions, item units, manual rates, analyses and bar lengths follow with exact factors.

21 Oct 2026 · 2 min read

EstiMatrix guides

Linked measurements for retrofitting: surface preparation, bonding agent and jacketing

Make one item mirror another's measurement rows live — no double entry, no mismatched quantities, full transparency for auditors.

20 Oct 2026 · 2 min read